subject
Mathematics, 21.06.2021 05:40 kikirogers3882

A single repairman looks after both machines 1 and 2. Each time it is repaired, machine i stays up for an exponential time with rate λi , i = 1, 2. when machine i fails, it requires an exponentially distributed amount of time to work with rate µi to complete its repair. The repairman will always service machine 1 when it is down. For instance if machine 1 fails while machine 2 is being repaired, then the repairman will immediately stop work on machine 2 and start on 1. (i) Set up the balance equations for this problem. [9] (ii) Find the proportion of time machine 2 is down

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:50
The verbal translation for the difference of m and 7 increased by 15
Answers: 3
question
Mathematics, 21.06.2019 18:30
In right ∆abc shown below, the midpoint of hypotenuse ac is located at d and segment bd is drawn.if ab = 12 and bc = 16, then explain why bd = 10. hint: consider what you know about the diagonals of a rectangle.
Answers: 2
question
Mathematics, 22.06.2019 00:00
What are the interpretations of the line 3x - 15y = 60? x-intercept y-interception a: x 20 - y -4 b: x 5 - y 20 c: x -3 - y 15 d: x -4 - y 20
Answers: 1
question
Mathematics, 22.06.2019 00:30
Three friends are comparing the prices of various packages of golf balls at a sporting goods store. hector finds a package of 6 golf balls that costs $4.50.
Answers: 3
You know the right answer?
A single repairman looks after both machines 1 and 2. Each time it is repaired, machine i stays up f...
Questions
question
Mathematics, 04.11.2020 08:50
question
Mathematics, 04.11.2020 08:50
question
Mathematics, 04.11.2020 08:50
question
Physics, 04.11.2020 08:50
question
Mathematics, 04.11.2020 08:50
question
English, 04.11.2020 08:50
Questions on the website: 13722361