subject
Mathematics, 14.06.2021 18:50 dianaparra826

Better Products, Inc., manufactures three products on two machines. In a typical week, 40 hours are available on each machine. The profit contribution and production time in hours per unit are as follows: Category Product 1 Product 2 Product 3
Profit/unit $30 $50 $20
Machine 1 time/unit 0.5 2.0 0.75
Machine 2 time/unit 1.0 1.0 0.5
Two operators are required for machine 1; thus, 2 hours of labor must be scheduled for each hour of machine 1 time. Only one operator is required for machine 2. A maximum of 100 labor-hours is available for assignment to the machines during the coming week. Other production requirements are that product 1 cannot account for more than 50% of the units produced and that product 3 must account for at least 20% of the units produced.
How many units of each product should be produced to maximize the total profit contribution?
Product # of units
1
2
3
What is the projected weekly profit associated with your solution?
Profit = $
How many hours of production time will be scheduled on each machine? If required, round your answers to two decimal places.
Machine Hours Schedule:
Machine 1 Hours
Machine 2 Hours
What is the value of an additional hour of labor? If required, round your answers to two decimal places.
$
Assume that labor capacity can be increased to 120 hours. Develop the optimal product mix, assuming that the extra hours are made available.
Product # of units
1
2
3
Profit = $
Would you be interested in using the additional 20 hours available for this resource?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:40
Given f(x)= 9x+1 and g(x)=x^3, choose the expression (f*g)(x)
Answers: 2
question
Mathematics, 21.06.2019 17:40
Aregular hexagon has sides of 2 feet. what is the area of the hexagon? 12 ft2 12 ft2 24 ft2 6 ft2
Answers: 2
question
Mathematics, 21.06.2019 19:00
Explain why the factor 1.5 is broke. into two numbers in the model.
Answers: 3
question
Mathematics, 21.06.2019 20:00
Can you me find the missing length. i attached an image.
Answers: 1
You know the right answer?
Better Products, Inc., manufactures three products on two machines. In a typical week, 40 hours are...
Questions
question
English, 21.12.2020 20:30
question
Biology, 21.12.2020 20:30
question
Mathematics, 21.12.2020 20:30
question
Mathematics, 21.12.2020 20:30
question
Mathematics, 21.12.2020 20:30
question
Mathematics, 21.12.2020 20:30
Questions on the website: 13722360