Mathematics, 03.06.2021 06:30 luna563
A contractor has two choices for billing a completed job.
· $500 flat rate, regardless of the number of hours worked
· $20 per hour worked
The graph shows the relationship between pay per hour and number of hours worked for both scenarios.
What is the solution to this system of equations, and what does it mean to the contractor?
The solution (0, 20) tells the contractor the minimum amount that can be charged.
The solution (0, 500) tells the contractor the maximum amount that can be charged.
The solution (25, 20) tells the contractor the number of hours on a job where the hourly rate is the same for both billing options.
The solution (20, 25) tells the contractor the number of hours on a job where the hourly rate is the same for both billing options.
Answers: 2
Mathematics, 20.06.2019 18:04
The diagonals of a rhombus are 12 inch and 16 inch long, the length of a side of a rhombus is 10 inch, what is the height of the rhombus
Answers: 1
Mathematics, 21.06.2019 18:30
The school that imani goes to is selling tickets to the annual dance competition. on the first day of the ticket sales the school sold 7 adult tickets and 5 child tickets for a total of $96. the school took in $40 on the second day by seling 3 adult tickets . find the price of an adult ticket and the price of a child ticket. solve by using substitution elimination college prep algebra math heres the 2 equations i came up with 7x+5y=96 and 3x+2y= -40 show all workiv be stuck on this.
Answers: 1
Mathematics, 21.06.2019 19:30
Solve the following simultaneous equation by using an algebraic method (either substitution or elimination) 2x + 3y=-4 4x-y=11
Answers: 1
A contractor has two choices for billing a completed job.
· $500 flat rate, regardless of the numbe...
Chemistry, 24.09.2019 10:50
History, 24.09.2019 10:50
Mathematics, 24.09.2019 10:50
World Languages, 24.09.2019 10:50
Mathematics, 24.09.2019 10:50
Biology, 24.09.2019 10:50
History, 24.09.2019 10:50
Mathematics, 24.09.2019 10:50
English, 24.09.2019 10:50