Mathematics, 25.05.2021 06:20 seanisom7
When building a house, the number of days required to build is inversely proportional to with the number of workers. One house was built in 110 days by 8 workers. How many days would it take to build a similar house with 44 workers?
Answers: 1
Mathematics, 21.06.2019 15:00
Asmall foreign car gete 42 miles per gallon and user 35 gallons on a trip.gasoline costs $1.05 per gallon.what was the cost of gasoline per mile driver?
Answers: 3
Mathematics, 21.06.2019 17:30
Noor brought 21 sheets of stickers. she gave 1/3 of a sheet to each of the 45 students at recess. she wants to give teachers 1 1/2 sheets each.
Answers: 2
Mathematics, 21.06.2019 20:50
These tables represent a quadratic function with a vertex at (0, -1). what is the average rate of change for the interval from x = 9 to x = 10?
Answers: 2
When building a house, the number of days required to build is inversely proportional to with the nu...
English, 18.09.2019 16:30
Mathematics, 18.09.2019 16:30
Geography, 18.09.2019 16:30
Biology, 18.09.2019 16:30
Mathematics, 18.09.2019 16:30
English, 18.09.2019 16:30
Physics, 18.09.2019 16:30