subject
Mathematics, 10.05.2021 19:00 kiaraangely100400

As part of the quality-control program for a catalyst manufacturing line, the raw materials (alumina and a binder) are tested for purity. The process requires that the purity of the alumina be greater than 84%. A random sample from a recent shipment of alumina yielded the following results (in percent): 93.2, 87.0, 92.1, 90.1, 87.1, and 93.4.
A hypothesis test will be done to determine whether or not to accept the shipment.
a. State the appropriate null and alternate hypotheses.
b. Compute the P-value.
c. Should the shipment be accepted? Explain.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:40
If sec theta = 5/3 and the terminal point determined by theta is in quadrant 4, then
Answers: 1
question
Mathematics, 21.06.2019 19:00
How do i start to solve? would appreciate a walk-thru! a bird sitting 16ft above the ground in an apple tree dislodges an apple. after how many seconds does the apple land on the ground? (assuming that no branches will interfere with it's fall)
Answers: 1
question
Mathematics, 21.06.2019 22:30
What is the distance between a and b? round your answer to the nearest tenth. a coordinate plane is shown. point a is located at negative 1, 5, and point b is located at 4, 1. a line segment connects the two points.
Answers: 1
question
Mathematics, 22.06.2019 00:00
Ineed with the quizzes in apex mathematics ii
Answers: 1
You know the right answer?
As part of the quality-control program for a catalyst manufacturing line, the raw materials (alumina...
Questions
question
Mathematics, 19.08.2019 10:30
question
Mathematics, 19.08.2019 10:30
question
Mathematics, 19.08.2019 10:30
question
Mathematics, 19.08.2019 10:30
Questions on the website: 13722363