The following data were obtained in a study taken on a horizontal milling machine: Parts produced per cycle: 8. Average measured cycle time: 8.36 minutes. Average measured stress time per cycle: 4.62 minutes. Average fast traverse time: 0.08 minutes. Average cutting time with electrical power: 3.66 minutes. Performance rating: 115%. Clearance (machine time): 10%. Slack (effort time): 15%. The operator works on the task 8 hours a day and produces 380 parts. How many standard hours does the operator work

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Which of the following answers is 7/9 simplified? 7/9 2/9 11/9 2/7
Answers: 2
question
Mathematics, 21.06.2019 20:30
    choose the correct definition for  extremo.  a.  end      b.  extra      c.  extract      d.  eventual 
Answers: 2
question
Mathematics, 21.06.2019 22:00
You are standing next to a really big circular lake. you want to measure the diameter of the lake, but you don't want to have to swim across with a measuring tape! you decide to walk around the perimeter of the lake and measure its circumference, and find that it's 400\pi\text{ m}400? m. what is the diameter dd of the lake?
Answers: 3
question
Mathematics, 22.06.2019 00:00
Given the diagram below, michael writes, "segment ac is congruent to segment ac." which of the following reasons allow him to write this statement?
Answers: 1
You know the right answer?
The following data were obtained in a study taken on a horizontal milling machine: Parts produced pe...
Questions
question
Advanced Placement (AP), 30.08.2019 02:50
Questions on the website: 13722362