subject
Mathematics, 29.04.2021 15:50 baseball1525

Question 9: Meybelyn, can finish a certain job in 12 hours and Adriana can finish the same job in 8 hours. If they work together for two hours, what percent of the job did they complete? Round your answer to the nearest
percent (whole number). *

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
Draw out the fraction then show how you would subtract 5 1/4
Answers: 2
question
Mathematics, 21.06.2019 15:00
Which sum or difference identity would you use to verify that cos (180° - ∅) = -cos ∅? a. sin (α -β) = sin α cos β – cos α sin β b. cos (α -β) = cos α cos β – sin α sin β c. cos (α -β) = cos α cos β + sin α sin β d. sin (α + β) = sin α cos β + cos α sin β
Answers: 2
question
Mathematics, 21.06.2019 19:00
Lucy and donavan measured the length of the school garden. lucys measurement is 11.3m and donavans measurement is 113 cm. could both be correct? explain
Answers: 1
question
Mathematics, 21.06.2019 19:30
Mr. brettler is hanging up a 5-foot tall rectangular welcome sign in the gym. he has drawn a sketch on a coordinate grid. he has the lower vertices of the sign at (9, –3) and (–6, –3). where would the upper vertices be on the grid?
Answers: 1
You know the right answer?
Question 9: Meybelyn, can finish a certain job in 12 hours and Adriana can finish the same job in 8...
Questions
question
Mathematics, 15.04.2020 23:13
question
Chemistry, 15.04.2020 23:13
question
Mathematics, 15.04.2020 23:13
Questions on the website: 13722367