subject
Mathematics, 28.04.2021 23:40 Maddoxaustin1

13. (24.6L, GH) The time, t, to prepare a field for planting is inversely proportional to the number of people, p,
who are working. A large field can be prepared by 5
workers in 24 days. In order to finish the field
sooner, the farmer plans to hire additional workers.
Write the equation and find how many workers are
needed to finish the field in 15 days.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
4+6x-3x^3 in standard form with explanations because i don’t understand
Answers: 1
question
Mathematics, 21.06.2019 14:00
Find the value of the cosine for angle a
Answers: 1
question
Mathematics, 21.06.2019 21:30
Look at the figure below: triangle abc is a right triangle with angle abc equal to 90 degrees. the length of ac is 5 units and the length of ab is 4 units. d is a point above c. triangle adc is a right triangle with angle dac equal to 90 degrees and dc parallel to ab. what is the length, in units, of segment cd?
Answers: 1
question
Mathematics, 21.06.2019 23:50
The federal reserve controls certain interest rates in the united states. investors often try to speculate as to whether the federal reserve will raise or lower rates and by how much. suppose a company conducts extensive interviews with financial analysts, and as a result, predicts that "thefed" will increase rates by an average of 0.25 percentage points every six months for the forseeable future. which type of equation could be used to model the predicted interest rates over the next several years, assuming no other significant changes? a) a linear equation b) a quadratic equation c) a polynomial equation d) an exponential equation
Answers: 3
You know the right answer?
13. (24.6L, GH) The time, t, to prepare a field for planting is inversely proportional to the numb...
Questions
question
Mathematics, 24.12.2019 12:31
question
Mathematics, 24.12.2019 12:31
Questions on the website: 13722360