An architect designing a bridge provides the recommendation that the builders hire 3 workers for every 2.5 tons of steel needed to construct the bridge. Which method would best be used to find how many workers to hire to build a bridge that requires 30 tons of steel?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
"you know, playing tennis is healthier than watching a tennis match on television," katya remarked to her couch potato brother. in this sentence, healthier is a/an a. superlative. b. comparative. c. positive form. d. adverb.
Answers: 2
question
Mathematics, 21.06.2019 15:00
An advertising firm has an old computer that can prepare a whole mailing in 6 hours. with the of newer model the job is complete in 2 hours. how long would it take the newer model to do the job alone?
Answers: 1
question
Mathematics, 21.06.2019 18:30
Select 2 statements that are true about the equation y+6=-10(x-3).1) the slope of the line is -102) the slope of the line is 33) one point on the line is (3,6)4) one point on the line is (3,-6)
Answers: 1
question
Mathematics, 21.06.2019 19:00
Me asap on # : explain how factoring a trinomial, ax^2+ bx+ c, when a does not equal 1 different from factoring a trinomial when a = 1.
Answers: 2
You know the right answer?
An architect designing a bridge provides the recommendation that the builders hire 3 workers for eve...