subject
Mathematics, 31.08.2019 06:00 anthonylopez1

During a tunnel construction project, engineers used explosives to excavate partway into a mountain. because of time constraints and environmental concerns, they later used a tunnel boring machine (tbm) to excavate the rest of the tunnel. the table shows the length of the completed tunnel, y, after different numbers of days, x, since the tbm started working. number of days length of tunnel (feet) 0 225 5 350 20 725 30 975 55 1,600 the length of the completed tunnel can be calculated using the equation . if the project will be completed 86 days after the tbm was introduced, the length of the completed tunnel will be feet.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 19:30
Піf x = y and y= z, which statement must be true? оа. -x = -2 b. x= z ос. —x = 2 od. 2= x
Answers: 3
question
Mathematics, 21.06.2019 21:00
The measure of angle 0 is 600 degrees
Answers: 1
question
Mathematics, 22.06.2019 01:30
The angle of elevation from point a to the top of a cliff is 38 degrees . if point a is 80 feet from the base of the cliff , how high is the cliff ?
Answers: 3
question
Mathematics, 22.06.2019 01:30
Robert is placing sod in two square shaped areas of his backyard. one side of the first area is 7.5 feet. one side of the other area is 5.7 feet. the sod costs y dollars per square foot
Answers: 3
You know the right answer?
During a tunnel construction project, engineers used explosives to excavate partway into a mountain....
Questions
question
Mathematics, 25.07.2019 13:20
question
Social Studies, 25.07.2019 13:20
Questions on the website: 13722363