subject
Mathematics, 16.10.2019 00:00 rleiphart1

What does a residual value of –0.8 mean in reference to the line of best fit? the given point is 0.8 units above the line of best fit. the given point is 0.8 units below the line of best fit. the line of best fit is not appropriate to the data. the line of best fit has a slope of 0.8.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 12:50
Which logarithmic equation is equivalent to the exponential equation below? e^a=55(you will receive 34 points)
Answers: 1
question
Mathematics, 21.06.2019 18:30
Can someone check if i did this correct. it’s number 4 if you’re wondering.
Answers: 1
question
Mathematics, 21.06.2019 19:30
Піf x = y and y= z, which statement must be true? оа. -x = -2 b. x= z ос. —x = 2 od. 2= x
Answers: 3
question
Mathematics, 21.06.2019 21:30
Atrain leaves little? rock, arkansas, and travels north at 90 kilometers per hour. another train leaves at the same time and travels south at 80 kilometers per hour. how long will it take before they are 680 kilometers? apart?
Answers: 1
You know the right answer?
What does a residual value of –0.8 mean in reference to the line of best fit? the given point is 0....
Questions
question
History, 25.09.2019 12:30
Questions on the website: 13722360