subject
Mathematics, 28.01.2020 19:55 whittingtondee7084

Aconstruction company can remove 412 metric tons of dirt from a construction site in 338 hours. what is the unit rate in metric tons per hour? write your answer as a fraction or a mixed number in simplest form.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 22.06.2019 00:30
What is the area of the parallelogram? 48 sqrt(3)cm2 48 cm2 24 sqrt (3) cm2 24 cm2
Answers: 2
question
Mathematics, 22.06.2019 05:00
Lena draws a square with an area that is greater than the area of rectangle b. what are two possible side lengths of lena's square? explain.
Answers: 3
question
Mathematics, 22.06.2019 07:30
Abagail read 5/8 of a 56 page library book how many pages did she read
Answers: 1
question
Mathematics, 22.06.2019 08:00
Barbara is tilling her craft room floor with square tiles. she wants 6/10 of the square tiles to be red. if she using 18 tiles. how many square tiles will be used to cover the floor? draw an area model to solve
Answers: 1
You know the right answer?
Aconstruction company can remove 412 metric tons of dirt from a construction site in 338 hours. what...
Questions
question
Mathematics, 19.04.2020 20:31
question
History, 19.04.2020 20:38
question
Mathematics, 19.04.2020 20:38
question
Mathematics, 19.04.2020 20:39
Questions on the website: 13722367