subject
Mathematics, 19.09.2019 12:00 solizj6728

Jp had two jobs. he makes 12 dollars an hour as a bus boy. he makes 21 dollars an hour working construction. he works 52 hrs and makes 966 dollars. how many hours did he spend at each job

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
David must install fencing around a lot that is shaped like a right angle.the side of lot that runs east-west is 200 ft long.the side of the lot runs north-south is 125 ft long.calculate how many feet of fencing he will need to surround the entire lot.
Answers: 2
question
Mathematics, 21.06.2019 20:00
Aconstruction worker has rope 9 m long he needs to cut it in pieces that are each 3 /5 m long how many such pieces can he cut without having any rope leftover?
Answers: 3
question
Mathematics, 21.06.2019 22:00
In the sixth grade 13 out of 20 students have a dog if there are 152 sixth grade students how many of them have a dog
Answers: 2
question
Mathematics, 21.06.2019 23:40
20 ! jason orders a data set from least to greatest. complete the sentence by selecting the correct word from each drop-down menu. the middle value of the data set is a measure and is called the part a: center b: spread part b: mean a: mean absolute deviation b: median c: range
Answers: 1
You know the right answer?
Jp had two jobs. he makes 12 dollars an hour as a bus boy. he makes 21 dollars an hour working const...
Questions
question
English, 05.09.2020 16:01
question
Chemistry, 05.09.2020 16:01
question
Biology, 05.09.2020 16:01
Questions on the website: 13722367