subject
Mathematics, 19.09.2019 22:00 kim95207

Paul can install a 300-square-foot hardwood floor in 18 hours. matt can install the same floor in 22 hours. how long would it take paul and matt to install the floor working together?
4 hours
9.9 hours
13.2 hours
30 hours

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
Select the correct answer from the drop-down menu. this graph represents the inequality x+2< 4,2x> 3,x+6< 12,2x> 12
Answers: 2
question
Mathematics, 21.06.2019 17:00
Bugs bunny was 33 meters below ground, digging his way toward pismo beach, when he realized he wanted to be above ground. he turned and dug through the dirt diagonally for 80 meters until he was above ground
Answers: 3
question
Mathematics, 21.06.2019 18:00
If f(x) = 4x – 3 and g(x) = 8x + 2, find each function value a.f[g(3)] b.g[f(5)] c.g{f[g(-4)]}
Answers: 3
question
Mathematics, 21.06.2019 19:00
What are the solutions of the system? solve by graphing. y = -x^2 - 3x + 2 y = -2x + 2
Answers: 1
You know the right answer?
Paul can install a 300-square-foot hardwood floor in 18 hours. matt can install the same floor in 22...
Questions
question
Health, 18.04.2021 09:00
question
Mathematics, 18.04.2021 09:00
question
Mathematics, 18.04.2021 09:00
question
Mathematics, 18.04.2021 09:00
question
Spanish, 18.04.2021 09:00
question
Mathematics, 18.04.2021 09:00
Questions on the website: 13722362