Paul can install a 300-square-foot hardwood floor in 18 hours. matt can install the same floor in 22 hours. how long would it take paul and matt to install the floor working together?
4 hours
9.9 hours
13.2 hours
30 hours
Answers: 2
Mathematics, 21.06.2019 15:00
Select the correct answer from the drop-down menu. this graph represents the inequality x+2< 4,2x> 3,x+6< 12,2x> 12
Answers: 2
Mathematics, 21.06.2019 17:00
Bugs bunny was 33 meters below ground, digging his way toward pismo beach, when he realized he wanted to be above ground. he turned and dug through the dirt diagonally for 80 meters until he was above ground
Answers: 3
Mathematics, 21.06.2019 18:00
If f(x) = 4x – 3 and g(x) = 8x + 2, find each function value a.f[g(3)] b.g[f(5)] c.g{f[g(-4)]}
Answers: 3
Mathematics, 21.06.2019 19:00
What are the solutions of the system? solve by graphing. y = -x^2 - 3x + 2 y = -2x + 2
Answers: 1
Paul can install a 300-square-foot hardwood floor in 18 hours. matt can install the same floor in 22...
Health, 18.04.2021 09:00
Mathematics, 18.04.2021 09:00
Mathematics, 18.04.2021 09:00
Mathematics, 18.04.2021 09:00
Mathematics, 18.04.2021 09:00
History, 18.04.2021 09:00
Spanish, 18.04.2021 09:00
Advanced Placement (AP), 18.04.2021 09:00
Mathematics, 18.04.2021 09:00
Mathematics, 18.04.2021 09:00