Mathematics, 14.04.2021 18:00 yazanadel56
A factory store has two types of machines.
The factory has 6 cutting machines and 4 stamping machines.
Each cutting machine cuts 105 parts every 3 minutes.
Each stamping machine stamps 24 parts every 20 seconds.
One of the cutting machine is shut down for repairs How many parts can the remaining machines cut in
412 hours?
788 parts
2,363 parts
28,350 parts
47,250 parts
Answers: 3
Mathematics, 21.06.2019 17:00
The equation of a circle is (x + 4)2 + (y + 6)2 = 16. determine the length of the radius. 10 4 16 8 my flower basket delivers flowers within a 20 mile radius of their store. if this area is represented graphically, with my flower basket located at (5, 2), what is the equation that represents the delivery area? (x - 2)2 + (y - 5)2 = 20 (x - 5)2 + (y - 2)2 = 20 (x + 5)2 + (y + 2)2 = 400 (x - 5)2 + (y - 2)2 = 400
Answers: 1
Mathematics, 21.06.2019 17:00
Lisa has three classes that each last 50 minutes. what is the total number of minutes of the three classes
Answers: 1
Mathematics, 21.06.2019 19:50
If the scale factor between two circles is 2x/5y what is the ratio of their areas?
Answers: 3
A factory store has two types of machines.
The factory has 6 cutting machines and 4 stamping machin...
Biology, 07.12.2021 19:20
Physics, 07.12.2021 19:20
Mathematics, 07.12.2021 19:20
Biology, 07.12.2021 19:20