subject
Mathematics, 06.04.2021 22:50 alcott1110

The manufacturer wishes to set up a control chart at the final inspection station for a gas water heater. Defects in workmanship and visual quality features are checked in this inspection. For the past 22 working days, 176 water heaters were inspected and a total of 924 nonconformities reported. (a) What type of control chart would you recommend here, and how would you use it?

(b) Using two water heaters as the inspection unit, calculate the center line and control limits that are consistent with the past 22 days of inspection data.

(c) What is the probability of type I error for the control chart in part (b)?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
How many sides does a regular polygon have if each exterior angle measures 72a.3b.4c.5d.6
Answers: 1
question
Mathematics, 21.06.2019 16:30
Which choice represents the sample space ,s for this event
Answers: 3
question
Mathematics, 21.06.2019 21:50
Which rule describes the composition of transformations that maps ajkl to aj"k"l"? ro. 900 o to, -2(x, y) to, -20 ro, 900(x, y) ro, 9000 t-2. o(x,y) t-2, 00 ro, 900(x, y)
Answers: 2
question
Mathematics, 21.06.2019 23:20
In the diagram below,abc is congruent to dec what is the value of x
Answers: 2
You know the right answer?
The manufacturer wishes to set up a control chart at the final inspection station for a gas water he...
Questions
question
Mathematics, 14.04.2020 05:38
Questions on the website: 13722363