Mathematics, 01.04.2021 22:50 joannegrace4898
Task:
Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers still need to dig 1700 feet to finish the project. How much time does it take to complete the tunnel from start to finish?
Will the engineers have enough time if the project was started in December 2020 and the deadline to finish the project was in August 2021? Please explain your answer for yes or no.
Hint:
y=mx+b (slope-intercept form)
x=time
y=distance
b=3200
Start & Finish: ??
Total length=3200ft
Answers: 2
Mathematics, 21.06.2019 21:30
Amir wants to proportionally increase the size of a photo to create a poster for his room. the size of the original photo is shown. complete the statement and then answer the question to represent ways that amir can increase the size of his photo.
Answers: 2
Mathematics, 22.06.2019 04:00
The height, h, of a cylinder is 5 units less than 3times its radius, r. which expression represents the height of the cylinder in terms of its radius
Answers: 2
Mathematics, 22.06.2019 04:30
Acircle has a diameter of 10 what is the area of the circle? use 3.14 for pi. round to the nearest hundredth
Answers: 1
Task:
Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the enginee...
History, 13.10.2019 04:30
Advanced Placement (AP), 13.10.2019 04:30
Biology, 13.10.2019 04:30
Mathematics, 13.10.2019 04:30
World Languages, 13.10.2019 04:30
Social Studies, 13.10.2019 04:30
Mathematics, 13.10.2019 04:30
Mathematics, 13.10.2019 04:30
Health, 13.10.2019 04:30
Mathematics, 13.10.2019 04:30
English, 13.10.2019 04:30
English, 13.10.2019 04:30
Health, 13.10.2019 04:30