Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers still need to dig 1700 feet to finish the project. How much time does it take to complete the tunnel from start to finish?
Will the engineers have enough time if the project was started in December 2020 and the deadline to finish the project was in August 2021? Please explain your answer for yes or no.
Hint:
y=mx+b (slope-intercept form)
x=time
y=distance
b=3200
Start & Finish: ??
Total length=3200ft
Left over=1700ft after 5 months of digging
help/
Answers: 2
Mathematics, 21.06.2019 15:00
If 1 is divided by the sum of y& 4. the result is equal to 3 divided by 4 .find the value of m?
Answers: 1
Mathematics, 21.06.2019 18:00
Ling listed all of the factors of a mystery number: 1,2,4,8,16,32 what is the mystery number?
Answers: 2
Mathematics, 21.06.2019 19:30
Evaluate the expression for the given value of the variable. ∣-4b-8∣+∣-1-b^2 ∣+2b^3 ; b=-2
Answers: 2
Mathematics, 21.06.2019 21:30
Having a hard time understanding this question (see attachment).
Answers: 2
Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers stil...
Social Studies, 03.04.2020 13:17
Mathematics, 03.04.2020 13:17
English, 03.04.2020 13:18
Mathematics, 03.04.2020 13:19
Mathematics, 03.04.2020 13:20
History, 03.04.2020 13:20
History, 03.04.2020 13:21
Mathematics, 03.04.2020 13:21