Mathematics, 01.04.2021 22:30 ladawnrowles005

Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers still need to dig 1700 feet to finish the project. How much time does it take to complete the tunnel from start to finish? Will the engineers have enough time if the project was started in December 2020 and the deadline to finish the project was in August 2021? Please explain your answer for yes or no.

Hint:
y=mx+b (slope-intercept form)
x=time
y=distance
b=3200
Start & Finish: ??
Total length=3200ft
Left over=1700ft after 5 months of digging

help please something for class they counting as a assessment grade :(

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Weak battery is considered to be a part of routine a. inspection b. wear and tear c. maintenance d. check
Answers: 2
question
Mathematics, 21.06.2019 21:30
Amir wants to proportionally increase the size of a photo to create a poster for his room. the size of the original photo is shown. complete the statement and then answer the question to represent ways that amir can increase the size of his photo.
Answers: 2
question
Mathematics, 22.06.2019 00:00
Layla answer 21 of the 25 questions on his history test correctly.what decimal represents the fraction of problem he answer incorrectly.
Answers: 1
question
Mathematics, 22.06.2019 00:20
Aline is perpendicular to another line m2= (-1/m1), where m1 is the slope of the original line and m2 is the slope of the perpendicular line. which of the following equations represents the line that passes through the point (-2,1) and is perpendicular to the line below?
Answers: 2
You know the right answer?
Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers stil...
Questions
question
Biology, 15.10.2019 15:20
question
Mathematics, 15.10.2019 15:20
question
Mathematics, 15.10.2019 15:20
Questions on the website: 13722367