A construction company has to complete a project no later than 3 months from now or there will be significant cost overruns. The manager of the construction company believes that there are four possible values for the random variable X, the number of months from now it will take to complete this project: 2, 2.5, 3, 3.5. The manager currently thinks that the probabilities of these four possibilities are in the ratio 1 to 2 and 2 to 4. That is X = 2.5 is twice as likely as X = 2, and X = 3 is twice as likely as X = 2.5 and X = 3.5 is half as likely as X = 3. 1) Find the probability distribution of X. Hint: P(X = 2) = 0.111, P(X = 3) = 0.444
2) What is the probability that this project will not be completed on time?
3) What is the expected completion time in months?
4) How much variability (in months) exists around the expected value?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Colby and jaquan are growing bacteria in an experiment in a laboratory. colby starts with 50 bacteria in his culture and the number of bacteria doubles every 2 hours. jaquan starts with 80 of a different type of bacteria that doubles every 3 hours. let x equal number of days. colbys experiment follows the model: a.) y=50*2^x b.) y=50*2^8x c.) y=50*2^12x jaquans experiment follows the model: a.)80*2^x b.)80*2^8x c.)80*2^12x
Answers: 3
question
Mathematics, 21.06.2019 18:30
Complex numbers multiply √-4 * √-25 and show all intermediate steps. alternative notation is sqrt(-4) * sqrt(-25).
Answers: 1
question
Mathematics, 21.06.2019 18:40
A33 gram sample of a substance that's used to detect explosives has a k-value of 0.1473. n = noekt no = initial mass (at time t = 0) n = mass at time t k = a positive constant that depends on the substance itself and on the units used to measure time t = time, in days
Answers: 1
question
Mathematics, 21.06.2019 20:00
Segment an is an altitude of right δabc with a right angle at a. if ab = 2, squared 5 in and nc = 1 in, find bn, an, ac.
Answers: 2
You know the right answer?
A construction company has to complete a project no later than 3 months from now or there will be si...
Questions
question
Mathematics, 29.06.2021 05:30
question
English, 29.06.2021 05:30
Questions on the website: 13722367