Mathematics, 24.03.2021 20:10 rakanmadi87
Dubois Corporation has four outlets across the country: Boston, Dallas, Los Angeles, and St. Paul. Plans call for the following number of products (in 1000s) to be needed at each location. 2.
Boston 80
Dallas 90
Los Angeles 70
St. Paul 110
Dubois has two warehouses located in St. Louis and Pittsburgh Dubois has three plants capable of producing the product. The plants and production capabilities are as follows:
Denver 100
Atlanta 150
Chicago 150
Transportation costs are as follows:
To St. Louis Pittsburgh From Denver Atlanta Chicago To Boston Dallas Los Angeles St. Paul From St. Louis Pittsburgh
a. Develop a network representation of this problem
b. Set up the objective function and the constraints
Answers: 1
Mathematics, 21.06.2019 16:40
Which of the following is the correct equation for this function? a. y= (x+4)(x+2) b. y=x^2+ 3x – 2 c. y+ 2 = – 2(x+3)^2 d. y+ 2 = 2(x+3)^2
Answers: 1
Mathematics, 21.06.2019 17:30
Lee has $1.75 in dimes and nickels. the number of nickels is 11 more than the number of dimes. how many of each coin does he have?
Answers: 1
Mathematics, 21.06.2019 20:00
Anature center offer 2 guided walks. the morning walk is 2/3 miles. the evening walk is 3/6 mile. which is shorter
Answers: 1
Mathematics, 21.06.2019 21:00
Tessa bought stock in a restaurant for $253.00. her stock is now worth $333.96. what is the percentage increase of the value of tessa's stock? a.) 81% b.) 32% c.) 24% d.) 76%
Answers: 1
Dubois Corporation has four outlets across the country: Boston, Dallas, Los Angeles, and St. Paul. P...
Mathematics, 02.03.2020 22:43
Mathematics, 02.03.2020 22:44