subject
Mathematics, 18.03.2021 02:20 phirejz6402

Si 27 hombres terminan una obra en 16 días, ¿cuántos hombres se necesitarán para terminar la obra en 24 días?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Graph red beads cost $1 an ounce and gold beads cost $3 an ounce. juanita wants to purchase a 12-ounce mixture of red and gold beads that she can sell for $2 an ounce. the solution of the system shows the number of beads needed for juanita to break even. x + y = 12, x + 3y = 24 how many ounces of red beads will juanita buy to break even? how many ounces of gold beads will she buy?
Answers: 3
question
Mathematics, 21.06.2019 19:20
The graph below shows the height of a projectile t seconds after it is launched. if acceleration due to gravity is -16 ft/s2, which equation models the height of the projectile correctly?
Answers: 2
question
Mathematics, 21.06.2019 21:00
Apiling for a high-rise building is pushed by two bulldozers at exactly the same time. one bulldozer exerts a force of 1250 pounds in a westerly direction. the other bulldozer pushes the piling with a force of 2650 pounds in a northerly direction. what is the direction of the resulting force upon the piling, to the nearest degree? a. 65 n of w b. 25 n of w c. 45 n of w d. 35 n of w
Answers: 1
question
Mathematics, 21.06.2019 23:30
Simplify (8x2 − 1 + 2x3) − (7x3 − 3x2 + 1). −5x3 + 11x2 − 2 5x3 − 11x2 + 2 x3 + 2x2 + x3 x3 − 2x2 − x3
Answers: 1
You know the right answer?
Si 27 hombres terminan una obra en 16 días, ¿cuántos hombres se necesitarán para terminar la obra en...
Questions
question
English, 07.12.2020 04:50
question
Geography, 07.12.2020 04:50
question
Mathematics, 07.12.2020 04:50
question
Spanish, 07.12.2020 04:50
Questions on the website: 13722367