subject
Mathematics, 13.03.2021 01:00 cmfield8810

if 9 men can complete a job in 4 days, how long will 8 men take to complete the same job, assuming that all the men are working at the same rate?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
Find the sum of the measure of the interior angles of a polygon of 9 sides ; of 32 sides
Answers: 1
question
Mathematics, 21.06.2019 17:00
The parabola x= √y-9 opens: a.)up b.)down c.)right d.)left
Answers: 1
question
Mathematics, 21.06.2019 18:00
The given dot plot represents the average daily temperatures, in degrees fahrenheit, recorded in a town during the first 15 days of september. if the dot plot is converted to a box plot, the first quartile would be drawn at __ , and the third quartile would be drawn at __ link to graph: .
Answers: 1
question
Mathematics, 21.06.2019 20:00
Graph the linear function using the slooe and y intercept
Answers: 2
You know the right answer?
if 9 men can complete a job in 4 days, how long will 8 men take to complete the same job, assuming t...
Questions
question
Mathematics, 02.11.2020 22:10
question
Mathematics, 02.11.2020 22:10
question
Mathematics, 02.11.2020 22:10
question
Mathematics, 02.11.2020 22:10
Questions on the website: 13722367