subject
Mathematics, 11.03.2021 01:00 GreenHerbz206

David can do a piece of work in 2 days while Ram can do the same work in 5 days. How long will it take if both of them work together?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
What is the sum or difference 4x10 – 9x10 (1 point) –5x10 –5x20 –36x10 –36x20 this is the cca test i need all the answers this is the first 2
Answers: 2
question
Mathematics, 21.06.2019 20:30
Solve each quadratic equation by factoring and using the zero product property. 14x - 49 = x^2
Answers: 2
question
Mathematics, 21.06.2019 21:30
The length of a field is 100 yards and its width is 75 yards. if 1 inch represents 25 yards, what would be the dimensions of the field drawn on a sheet of paper?
Answers: 1
question
Mathematics, 21.06.2019 21:50
What is the 17th term in the arithmetic sequence in which a6 is 101 and a9 is 83
Answers: 1
You know the right answer?
David can do a piece of work in 2 days while Ram can do the same work in 5 days. How long will it t...
Questions
question
Mathematics, 26.08.2019 09:00
question
Mathematics, 26.08.2019 09:00
question
Mathematics, 26.08.2019 09:00
question
Social Studies, 26.08.2019 09:00
question
Mathematics, 26.08.2019 09:00
Questions on the website: 13722361