subject
Mathematics, 10.03.2021 01:00 katyvillanueva05

During construction the workers need to mix dried bentonite into the concrete as it is being mixed to get the desired consistency. The workers decide to mix 800 mg of Bentonite to be mixed with 198 lb of concrete mix every 8 hours. The information for the concrete shows that 25-75 mg/kg per day is the appropriate mixture consistency. Are the workers within the desired range? (Note: 1kg = 2.2 lbs)

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 19:30
Simplify (1/2)4th power a. (1/16) b.(1/8) c.(1/4)
Answers: 2
question
Mathematics, 21.06.2019 22:30
What is the point of inflection for the function f(x)=2cos4x on the interval (0, pi/2)
Answers: 2
question
Mathematics, 21.06.2019 23:30
Ahighway between points a and b has been closed for repairs. an alternative route between there two locations is to travel between a and c and then from c to b what is the value of y and what is the total distance from a to c to b?
Answers: 1
question
Mathematics, 22.06.2019 00:50
4. a single woman uses an online cash flow calculator which reveals a cash flow of 203. what does this mean?
Answers: 3
You know the right answer?
During construction the workers need to mix dried bentonite into the concrete as it is being mixed t...
Questions
question
Mathematics, 06.05.2020 00:10
Questions on the website: 13722363