subject
Mathematics, 09.03.2021 18:10 jere0797

Company 2 charges $4600 for the first 550 feet of fence and $29 for each additional foot. Find the cost if Company 2 completes the job. Show your work. The total fencing is 615.21

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
Venus is about 108 kilometers from the sun. saturn is about 109 kilometers from the sun. about how many times farther from the sun is saturn than venus?
Answers: 1
question
Mathematics, 21.06.2019 15:40
Use properties to rewrite the given equation. which equations have the same solution as 2.3p – 10.1 = 6.5p – 4 – 0.01p?
Answers: 2
question
Mathematics, 21.06.2019 23:30
The average daily maximum temperature for laura’s hometown can be modeled by the function f(x)=4.5sin(Ο€x/6)+11.8 , where f(x) is the temperature in Β°c and x is the month. x = 0 corresponds to january.what is the average daily maximum temperature in may? round to the nearest tenth of a degree if needed.use 3.14 for Ο€ .
Answers: 1
question
Mathematics, 22.06.2019 00:50
Assume that adults have iq scores that are normally distributed with a mean of mu equals 100 and a standard deviation sigma equals 20. find the probability that a randomly selected adult has an iq between 80 and 120.assume that adults have iq scores that are normally distributed with a mean of mu equals 100 and a standard deviation sigma equals 20. find the probability that a randomly selected adult has an iq between 80 and 120.
Answers: 3
You know the right answer?
Company 2 charges $4600 for the first 550 feet of fence and $29 for each additional foot. Find the c...
Questions
question
Mathematics, 09.07.2019 11:00
question
Social Studies, 09.07.2019 11:00
Questions on the website: 13722363