subject
Mathematics, 22.02.2021 23:20 jasminethomas5159

Tony calculates that 3 cubic metres of concrete is enough for the path. He decides to use a concrete mix which has:

cement = 1 part

sand = 2 parts

gravel = 3 parts

How many cubic metres of gravel does Tony need?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:20
The lengths of nails produced in a factory are normally distributed with a mean of 4.91 centimeters and a standard deviation of 0.05 centimeters. find the two lengths that separate the top 4% and the bottom 4%. these lengths could serve as limits used to identify which nails should be rejected. round your answer to the nearest hundredth, if necessary.
Answers: 3
question
Mathematics, 21.06.2019 20:00
Select the graph of the solution. click until the correct graph appears. |x| = 3
Answers: 2
question
Mathematics, 21.06.2019 22:30
What is the distance between a and b? round your answer to the nearest tenth. a coordinate plane is shown. point a is located at negative 1, 5, and point b is located at 4, 1. a line segment connects the two points.
Answers: 1
question
Mathematics, 22.06.2019 00:30
Which equation represents h for right triangle abc
Answers: 1
You know the right answer?
Tony calculates that 3 cubic metres of concrete is enough for the path. He decides to use a concret...
Questions
question
Mathematics, 07.04.2021 17:20
question
Mathematics, 07.04.2021 17:20
question
Mathematics, 07.04.2021 17:20
Questions on the website: 13722363