The Rivertown city council is attempting to choose one of four sites (A, B, C, or D) as the location for its new emergency facility. After the new emergency facility becomes available for service, the current emergency facility will be shut down. The project manager has estimated the following response times in minutes from each of the proposed sites to the four areas that must be served by the emergency facility. proposed-site Area-Served
1 2 3 4
A 5.2 4.4 3.6 6.5
B 6.0 7.4 3.4 4.0
C 5.8 5.9 5.9 5.8
D 4.3 4.8 6.5 5.1

The number of emergency runs from the current emergency facility to each of the four areas over the past year is as follows:

Area 1 2 3 4
Number-runs 150 65 175 92

Compute the weighted mean response time from the proposed locations and determine which proposed site should be selected for the new emergency facility.

a. site A
b. site B
c. site C
d. site D

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
If x + 10 = 70, what is x? a. 40 b. 50 c. 60 d. 70 e. 80
Answers: 2
question
Mathematics, 21.06.2019 18:40
Valentina is subtracting from . she finds the lcd to be 15y2. what is valentina's next step?
Answers: 2
question
Mathematics, 21.06.2019 21:30
Anumber cube is rolled two times in a row. find the probability it will land on 2 on the first roll and a number greater then 4 on the second roll
Answers: 1
question
Mathematics, 21.06.2019 23:00
John has 1/2 pound of oranges to share with julie. if they share the oranges equally, how much will each of them have?
Answers: 1
You know the right answer?
The Rivertown city council is attempting to choose one of four sites (A, B, C, or D) as the location...
Questions
question
Physics, 21.09.2021 19:20
question
Mathematics, 21.09.2021 19:20
Questions on the website: 13722367