subject
Mathematics, 09.02.2021 04:50 sssudeegaming1943

Tony calculates that 3 cubic metres of concrete is enough for the path. He decides to use a concrete mix which has: cement = 1 partsand = 2 partsgravel = 3 parts How many cubic metres of gravel does Tony need? Question response area Select one option 0.5 1.0 1.5

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
Ascatterplot is produced to compare the size of a school building to the number of students at that school who play an instrument. there are 12 data points, each representing a different school. the points are widely dispersed on the scatterplot without a pattern of grouping. which statement could be true
Answers: 1
question
Mathematics, 21.06.2019 18:20
The number if marbles of different colors stored in a hat is listed below: 4 red marbles 10 green marbles 7 blue marbles. without looking in the hat, dan takes out a marble at random. he replaces the marble and then takes out another marble from the hat. what is the probability that dan takes out a blue marble in both draws?
Answers: 1
question
Mathematics, 21.06.2019 18:30
Me complete this proof! prove that a quadrilateral is a square. me with the steps for this proof.
Answers: 1
question
Mathematics, 21.06.2019 20:00
What is the radical expression that is equivalent to the expression 27 1 over 5?
Answers: 3
You know the right answer?
Tony calculates that 3 cubic metres of concrete is enough for the path. He decides to use a concrete...
Questions
question
Mathematics, 26.10.2020 06:10
question
Mathematics, 26.10.2020 06:10
question
Mathematics, 26.10.2020 06:10
question
Mathematics, 26.10.2020 06:10
Questions on the website: 13722362