Mathematics, 09.02.2021 01:20 theeflyguy5
One of the assumptions underlying the theory of control charting is that successive plotted points are independent of one another. Each plotted point can signal either that a manufacturing process is operating correctly or that there is some sort of malfunction. Even when a process is running correctly, there is a small probability that a particular point will signal a problem with the process. Suppose that this probability is 0.05. What is the probability that at least one of 10 successive points indicates a problem when in fact the process is operating correctly? (Round your answer to three decimal places.) What is the probability that at least one of 45 successive points indicates a problem when in fact the process is operating correctly? (Round your answer to three decimal places.)
Answers: 2
Mathematics, 21.06.2019 21:00
Sue's average score for three bowling games was 162. in the second game, sue scored 10 less than in the first game. in the third game, she scored 13 less than in the second game. what was her score in the first game?
Answers: 2
Mathematics, 22.06.2019 00:20
The circle below is centered at the point (3, 1) and has a radius of length 2. what is the equation?
Answers: 1
Mathematics, 22.06.2019 00:30
A10 inch cookie cake is divided into 8 slices. what is the area of 3 slices
Answers: 1
One of the assumptions underlying the theory of control charting is that successive plotted points a...
Health, 30.12.2020 23:40
Computers and Technology, 30.12.2020 23:40
Mathematics, 30.12.2020 23:40
Mathematics, 30.12.2020 23:40
Mathematics, 30.12.2020 23:40
Mathematics, 30.12.2020 23:40
English, 30.12.2020 23:40
Mathematics, 30.12.2020 23:40