subject
Mathematics, 19.08.2019 01:30 moniquejackson2

Aconstruction company builds a new rail line from town a to town b. they complete 1 1/4 miles in their first week of work and 1 2/3 miles in the second week. if they still have 25 3/4 left to build, what is the distance from town a to town b ?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
In the triangles, tr = ge and sr = fe. if = 3.2 ft, which is a possible measure of ? 1.6 ft 3.0 ft 3.2 ft 4.0 ft
Answers: 2
question
Mathematics, 21.06.2019 18:50
Determine if the function below is continuous. a. continuous b. not continuous, 1 hole c. not continuous, > 2 holes d. not continuous, 2 holes
Answers: 1
question
Mathematics, 21.06.2019 20:30
Two triangles can be formed with the given information. use the law of sines to solve the triangles. b = 49°, a = 16, b = 14
Answers: 3
question
Mathematics, 21.06.2019 21:00
Two cars which are 40 miles apart start moving simultaneously in the same direction with constant speeds. if the speed of the car which is behind is 56 mph and the speed of the other car is 48 mph, how many hours will it take for the car which is behind to catch up the car ahead of it?
Answers: 2
You know the right answer?
Aconstruction company builds a new rail line from town a to town b. they complete 1 1/4 miles in the...
Questions
question
Mathematics, 18.12.2020 04:20
question
English, 18.12.2020 04:20
question
Mathematics, 18.12.2020 04:20
Questions on the website: 13722359