This exercise illustrates that poor quality can affect schedules and costs. A manufacturing process has 90 customer orders to fill. Each order requires one component part that is purchased from a supplier. However, typically, 3% of the components are identified as defective, and the components can be assumed to be independent.
Required:
a. If the manufacturer stocks 90 components, what is the probability that the 90 orders can be filled without reordering components?
b. If the manufacturer stocks 102 components, what is the probability that the 100 orders can be filled without reordering components?
c. If the manufacturer stocks 105 components, what is the probability that the 100 orders can be filled without reordering components?
Answers: 1
Mathematics, 21.06.2019 22:20
Given the following linear function sketch the graph of the function and find the domain and range. Æ’(x) = -5x + 4
Answers: 2
Mathematics, 21.06.2019 23:30
The legs of a right triangle measure 6 meters and 8 meters. what is the length of the hypotonuse.
Answers: 1
Mathematics, 22.06.2019 03:00
Which angle of rotation is an angle of rotational symmetry for all figures?
Answers: 2
This exercise illustrates that poor quality can affect schedules and costs. A manufacturing process...
Mathematics, 24.03.2021 01:00
Mathematics, 24.03.2021 01:00
Mathematics, 24.03.2021 01:00
Mathematics, 24.03.2021 01:00
English, 24.03.2021 01:00
Mathematics, 24.03.2021 01:00
Social Studies, 24.03.2021 01:00
Mathematics, 24.03.2021 01:00
Biology, 24.03.2021 01:00
Mathematics, 24.03.2021 01:00
Mathematics, 24.03.2021 01:00
Arts, 24.03.2021 01:00