A factory process requires 3 steps to finish a product. The steps each have a mean completion time of A= 10 seconds and a standard deviation of o = 5 seconds. The time it takes to complete each step is independent from the other steps. Let T be the total completion time for the 3 steps. Find the standard deviation of T.

Choose 1

OT = 15 seconds

Or = 75 seconds

or 15 seconds

or = v75 seconds

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
If a and b are the measures of two first quadrant angles and sin a = 4/9 and sin b = 2/5 find sin(a+b).
Answers: 1
question
Mathematics, 21.06.2019 16:00
Select the correct answer. joshua likes to read. he read 6 books when he was 6 years old. every year he doubled the number of books he read the previous year. how many total books did he read between the ages of 6 and 10? a. 60 b. 90 c.186 d.187
Answers: 1
question
Mathematics, 21.06.2019 19:00
List the sides of δrst in ascending order (shortest to longest) if: m∠r =x+28°, m∠s = 2x+16°, and m∠t = x+12
Answers: 1
question
Mathematics, 21.06.2019 22:30
Acampus club held a bake sale as a fund raiser, selling coffee, muffins, and bacon and eggs sandwiches. the club members charged $1 for a cup of coffee, 3$ for a muffin , and $4 for a back. and egg sandwich. they sold a total of 55 items , easing $119. of the club members sold 5 more muffins than cups of coffee, how many bacon and egg sandwiches he’s did they sell
Answers: 1
You know the right answer?
A factory process requires 3 steps to finish a product. The steps each have a mean completion time o...
Questions
question
Computers and Technology, 10.07.2019 00:10
Questions on the website: 13722359