Mathematics, 31.01.2021 01:00 yungkxng57
Samantha constructs a scatter plot. She realizes that she needs to add one more point, which will be an outlier.
Which of the ordered pairs does she still need to plot?
(19,9)
(8,6)
(10,14)
(4,15)
Coordinate plane with horizontal axis labeled Variable X and vertical axis labeled Variable Y. The following ordered pairs, which are approximated, are plotted 2.5 comma 15, 5 comma 15, 6 comma 12, 7 comma 14, 10 comma 12, 11 comma 12, 12.5 comma 11, 13 comma 11, 16.5 comma 9, and 19 comma 7.
Answers: 3
Mathematics, 21.06.2019 20:30
Answer asap evaluate 4-0.25g+0.5h4−0.25g+0.5h when g=10g=10 and h=5h=5.
Answers: 3
Mathematics, 21.06.2019 23:30
Kerion has a beaded necklace business. she can make 12 necklaces is 2 hours. how long will it take her to make 9 necklaces?
Answers: 1
Mathematics, 22.06.2019 01:00
The computer that controls a bank's automatic teller machine crashes a mean of 0.6 times per day. what is the probability that, in any seven-day week, the computer will crash less than 5 times? round your answer to four decimal places
Answers: 2
Mathematics, 22.06.2019 02:30
Wow i want to vacation in mexico jeremih wow old vacation in mexico jeremiah we read read reads a distance marker that indicates he is 89 km from juarez if 1 mile approximately 1.61 km how far is jeremiah from juarez
Answers: 1
Samantha constructs a scatter plot. She realizes that she needs to add one more point, which will be...
Mathematics, 28.06.2019 02:30
Mathematics, 28.06.2019 02:30
Mathematics, 28.06.2019 02:30
Mathematics, 28.06.2019 02:30
Mathematics, 28.06.2019 02:30
Geography, 28.06.2019 02:30