subject
Mathematics, 14.01.2021 20:20 tilsendt

A machine creates pipe fittings at a constant rate at a manufacturing company. During a 10-hour shift, the machine is scheduled to create 500 pipe fittings. The graph shows the remaining number of pipe fittings that need to be created during the shift as a linear function of x, the time in hours. Study the graph below...
Pipe Fittings... Total Pipe Fittings Remaining...
Time
Hours...

Which answer choice best describes the domain and range of the function for this situation?

A. Domain: {−50}
Range: {500}

A. , Domain: , negative 50, , , Range: 500 , ,

B. Domain: {500}
Range: {−50}

B. , Domain: , 500, , , Range: negative 50 , ,

C. Domain: All real numbers greater than or equal to 0 and less than or equal to 500.
Range: All real numbers greater than or equal to 0 and less than or equal to 10.

C. , Domain: All real numbers greater than or equal to 0 and less than or equal to 500., , Range: All real numbers greater than or equal to 0 and less than or equal to 10., ,

D. Domain: All real numbers greater than or equal to 0 and less than or equal to 10.
Range: All real numbers greater than or equal to 0 and less than or equal to 500.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
Tree diagram to find the prime factors of 18
Answers: 2
question
Mathematics, 21.06.2019 21:30
Carl's candies has determined that a candy bar measuring 3 inches long has a z-score of +1 and a candy bar measuring 3.75 inches long has a z-score of +2. what is the standard deviation of the length of candy bars produced at carl's candies?
Answers: 1
question
Mathematics, 21.06.2019 23:30
In a right triangle δabc, the length of leg ac = 5 ft and the hypotenuse ab = 13 ft. find: b the length of the angle bisector of angle ∠a.
Answers: 1
question
Mathematics, 22.06.2019 00:00
Let u = {q, r, s, t, u, v, w, x, y, z} a = {q, s, u, w, y} b = {q, s, y, z} c = {v, w, x, y, z}. list the elements in the set.a ∩ (b ∪ c)a) {q, s, w, y}b) {q, y, z}c) {q, s, u, w, y, z}d) {q, r, w, y, z}
Answers: 1
You know the right answer?
A machine creates pipe fittings at a constant rate at a manufacturing company. During a 10-hour shif...
Questions
Questions on the website: 13722360