Answers: 1
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 21.06.2019 22:30
What is the distance from zero if a quadratic function has a line of symmetry at x=-3 and a zero at 4
Answers: 1
Mathematics, 22.06.2019 00:30
Which of these side lengths could form a triangle a) 2 cm , 2 cm , 4 cm b) 3 cm , 5 cm , 10 cm c) 3 cm , 4 cm , 5 cm d) 4 cm , 8 cm , 15 cm
Answers: 1
Mathematics, 22.06.2019 00:30
If it 8 inch candle burns at 7/10 inch per hour and a 6 inch candle burns at 1/5 inch per hour after how many hours would both candles be the same height
Answers: 1
What is COP in mathematics...
Social Studies, 18.03.2021 16:20
English, 18.03.2021 16:20
Social Studies, 18.03.2021 16:20
Mathematics, 18.03.2021 16:20
Mathematics, 18.03.2021 16:20
Mathematics, 18.03.2021 16:20
Biology, 18.03.2021 16:20
Mathematics, 18.03.2021 16:20