subject
Mathematics, 08.01.2021 21:30 joeyhd

A civil engineering firm is analyzing street routes from the theatre to the park. It is considering a big construction project near the library which is 2 blocks north and 6 blocks east of the theatre. So as not to increase traffic, it will delay this project until the early winter if the probability of a random driver going through the library intersection is above 0.2. Will the engineering firm need to delay the project? Best explained answer will be marked brainliest.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
If the cost to mail a package is an initial $5 and $0.28 for every pound the total cost to mail a package was $11.27, how much did the package weigh?
Answers: 1
question
Mathematics, 21.06.2019 18:30
Aswimming pool had 2.5 million liters of water in it. some water evaporated, and then the pool only had 22 million liters of water in it. what percent of the water evaporated?
Answers: 1
question
Mathematics, 21.06.2019 23:00
An elevator travels 310 feet in 10 seconds. at that speed, how far can't his elevator travel in 12 seconds?
Answers: 1
question
Mathematics, 22.06.2019 00:30
The nth term of a sequence in 2n-1 the nth term of a different sequence is 3n+1 work out 3 numbers that are in bothe sequences and are between 20 and 40
Answers: 2
You know the right answer?
A civil engineering firm is analyzing street routes from the theatre to the park. It is considering...
Questions
question
SAT, 15.12.2020 01:10
question
Mathematics, 15.12.2020 01:10
Questions on the website: 13722367