Jonah Arkfeld, a building contractor, is preparing a bid on a new construction project. Two other contractors will be submitting bids for the same project. Jonah has analyzed past bidding practices and the requirements of the project to determine the probability distributions of the two competing contractors. The bid from Contractor A can be described with a triangular distribution with a minimum value of $600,000, a maximum value of $800,000, and a most likely value of $725,000. The bid from Contractor B can be described with a normal distribution with a mean of $700,000 and a standard deviation of $50,000. Required:
a. If Jonah submits a bid of $750,000, what is the probability that he will win the bid for the project?
b. What is the probability that Contractor A and Contractor B will win the bid, respectively?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:40
Which point on the x-axis lies on the line that passes through point c and is parallel to lino ab?
Answers: 1
question
Mathematics, 21.06.2019 21:00
Ade and abc are similar. which best explains why the slope of the line between points a and d is the same as the slope between points a and b?
Answers: 2
question
Mathematics, 21.06.2019 21:00
Rewrite the following quadratic functions in intercept or factored form. show your work. f(t) = 20t^2 + 14t - 12
Answers: 1
question
Mathematics, 21.06.2019 22:10
Erinn wrote the equation –5x + 4y = 32 to represent her hourly wage (y) and how this wage has changed during each year that she worked at a company (x). what is the rate of change in erinn's hourly wage per year?
Answers: 2
You know the right answer?
Jonah Arkfeld, a building contractor, is preparing a bid on a new construction project. Two other co...
Questions
question
Mathematics, 24.08.2021 14:00
Questions on the website: 13722367