subject
Mathematics, 23.12.2020 17:10 simmy6

4.8.2 Slope and Rise The least possible slope shall be used for any ramp. The maximum slope of a ramp in new construction shall be 1:12. The maximum rise for any ramp run shall be 30 inches. Curb ramps and ramps to be constructed on existing sites or in existing buildings or facilities may have slopes and rises, if space limitations prohibit the use of a 1:12 slope or less.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
School has 204 sixth grade students. if the sixth grade is 30% of the total school, how many students are in the middle school?
Answers: 2
question
Mathematics, 21.06.2019 18:50
Need 50 will mark brainliest answer. find the lengths of all the sides and the measures of the angles.
Answers: 1
question
Mathematics, 22.06.2019 00:30
Answer 20 points and brainiest ! on the board, your teacher writes an example of how to find the median. one of the numbers is erased, leaving what is shown, 18, 30, 26,12 22. what is the median? a. 10 b. 20 c. 24 d. 28
Answers: 2
question
Mathematics, 22.06.2019 01:00
Luis has a cooler filled with cans of soda.for every 5 cans of coke there are 3 cans of sprite.if there are 25 cans of coke, how mant cans of sprite are there?
Answers: 2
You know the right answer?
4.8.2 Slope and Rise The least possible slope shall be used for any ramp. The maximum slope of a ram...
Questions
question
Mathematics, 22.02.2021 17:30
question
Social Studies, 22.02.2021 17:30
Questions on the website: 13722362