Mathematics, 13.12.2020 22:00 smn43713
The number of machine parts produced at a manufacturing plant is based on the number of parts made in a given day
and the number of hours worked. Let P = 14x + 100 give the number of parts that are produced since the start of the
shift and H = x be the number of hours that are to be worked that particular day. Create the equation that would give
the number of parts produced per hour.
Answers: 3
Mathematics, 21.06.2019 22:30
Sketch the vector field vector f( vector r ) = 8vector r in the xy-plane. select all that apply. the length of each vector is 8. the lengths of the vectors decrease as you move away from the origin. all the vectors point away from the origin. all the vectors point in the same direction. all the vectors point towards the origin. the lengths of the vectors increase as you move away from the origin.
Answers: 2
Mathematics, 21.06.2019 22:30
Convert (-3,0) to polar form. a. (3,0’) b. (-3,180’) c. (3,180’) d. (3,360’)
Answers: 1
Mathematics, 22.06.2019 00:30
36x2 + 49y2 = 1,764 the foci are located at: a) (-√13, 0) and (√13,0) b) (0, -√13) and (0,√13) c) (-1, 0) and (1, 0)
Answers: 1
Mathematics, 22.06.2019 03:30
Identify the number as a regional or irrational.explain. 291.87
Answers: 1
The number of machine parts produced at a manufacturing plant is based on the number of parts made i...
Mathematics, 03.03.2021 18:20
History, 03.03.2021 18:20
Mathematics, 03.03.2021 18:20
Social Studies, 03.03.2021 18:20
Computers and Technology, 03.03.2021 18:20
Mathematics, 03.03.2021 18:20
Mathematics, 03.03.2021 18:20
Mathematics, 03.03.2021 18:20
Arts, 03.03.2021 18:20