subject
Mathematics, 09.12.2020 08:30 tus

The number of machine parts produced at a manufacturing plant is based on the number of parts made in a given day and the number of hours worked. Let P = 14x2 + 100 give the number of parts that are produced since the start of the shift and H = x be the number of hours that are to be worked that particular day. Create the equation that would give the number of parts produced per hour.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
You have two cards with a sum of -12 in both hands. a. what two cards could you have? b. you add two more cards to your hand, but the total sum if the cards remains the same, (-12).
Answers: 1
question
Mathematics, 21.06.2019 12:30
Danny draws a transversal, t, on two parallel lines ab and cd, as shown below: he makes the following table to prove that the alternate interior angles are equal: which is the missing justification? (6 points) corresponding angles formed by a transversal on parallel lines are supplementary. corresponding angles formed by a transversal on parallel lines are congruent. co-interior angles formed by a transversal on parallel lines are congruent. co-exterior angles formed by a transversal on parallel lines are congruent.
Answers: 1
question
Mathematics, 21.06.2019 19:30
Which describes the difference between the graph of f(x)=x^2 and g(x)=-(x^2-2)
Answers: 1
question
Mathematics, 21.06.2019 21:00
Rewrite the following quadratic functions in intercept or factored form. show your work. f(x) = 3x^2 - 12
Answers: 1
You know the right answer?
The number of machine parts produced at a manufacturing plant is based on the number of parts made i...
Questions
question
Mathematics, 20.07.2021 03:50
question
Mathematics, 20.07.2021 03:50
Questions on the website: 13722367