Your friend estimated that it would take 5 hours to finish an art project. It actually took him 16 hours to finish the project. The amount of time it took to finish the project was blank percent of the estimated time. What does it mean to have more than 100% of something?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 20:00
Three baby penguins and their father were sitting on an iceberg 0.50.50, point, 5 meters above the surface of the water. the father dove down 4.74.74, point, 7 meters from the iceberg into the water to catch dinner for his kids. what is the father penguin's position relative to the surface of the water?
Answers: 2
question
Mathematics, 21.06.2019 21:00
Two cars which are 40 miles apart start moving simultaneously in the same direction with constant speeds. if the speed of the car which is behind is 56 mph and the speed of the other car is 48 mph, how many hours will it take for the car which is behind to catch up the car ahead of it?
Answers: 2
question
Mathematics, 21.06.2019 21:30
Every weekday, mr. jones bikes from his home to his job. sometimes he rides along two roads, the long route that is shown by the solid lines. other times, he takes the shortcut shown by the dashed line. how many fewer kilometers does mr. jones bike when he takes the shortcut instead of the long route?
Answers: 1
question
Mathematics, 21.06.2019 22:00
What is the value of the discriminant of the quadratic equation -2x = -8x + 8 and what does its value mean about thenumber of real number solutions the equation has?
Answers: 3
You know the right answer?
Your friend estimated that it would take 5 hours to finish an art project. It actually took him 16 h...
Questions
question
Mathematics, 18.03.2021 04:44
question
Mathematics, 18.03.2021 04:44
question
Mathematics, 18.03.2021 04:45
question
Mathematics, 18.03.2021 04:45
Questions on the website: 13722360