subject
Mathematics, 02.12.2020 06:00 alexbrafford

A bricklayer can build a wall of a certain size in 5 hours. Another bricklayer can do the same job in 4 hours. If the bricklayers work together, how long would it take to do the job? a. 9h
b. 2(2/9)h
c. 20h
d. 4(1/2)h

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
Ben wants to play a carnival game that costs $2. in his pocket he has 5 red tickets worth 35 cents each, and 15 blue tickets worth 10 cents each. which of the following systems of inequalities correctly represents the constraints on the variables in this problem? let represent the red tickets and b represent the blue tickets.
Answers: 2
question
Mathematics, 21.06.2019 14:00
When drawing a trend line for a series of data on a scatter plot, which of the following is true? a. there should be an equal number of data points on either side of the trend line. b. all the data points should lie on one side of the trend line. c. the trend line should not intersect any data point on the plot. d. the trend line must connect each data point on the plot.
Answers: 2
question
Mathematics, 21.06.2019 14:20
G(x) = 2 sin(2x - π) + 4. using complete sentences, explain how to find the minimum value for the function.
Answers: 3
question
Mathematics, 21.06.2019 15:40
Given the following sampling distribution of one mean with a sample size 49, from a normally distributed population,find the population standard deviation, o.79828588912497
Answers: 3
You know the right answer?
A bricklayer can build a wall of a certain size in 5 hours. Another bricklayer can do the same job i...
Questions
question
Business, 02.12.2020 05:30
question
Engineering, 02.12.2020 05:30
question
Mathematics, 02.12.2020 05:30
question
Mathematics, 02.12.2020 05:30
question
Mathematics, 02.12.2020 05:30
Questions on the website: 13722362