subject
Mathematics, 27.11.2020 22:20 greg777

A cereal packing machine fill 15 oz boxes at a rate of 3 boxes every 2 minutes. production has scheduled 600 lbs to be processed during each 8-hour shift. Approoximately how many minutes of down time will the machine have during each shift.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 19:30
∆red ≅ ∆ by rule will give brainiest if possible
Answers: 2
question
Mathematics, 21.06.2019 19:30
Evaluate 3(a + b + c)squared for a = 2, b = 3, and c = 4. a. 54 b. 243 c.729 add solution .
Answers: 1
question
Mathematics, 21.06.2019 19:50
Raj encoded a secret phrase using matrix multiplication. using a = 1, b = 2, c = 3, and so on, he multiplied the clear text code for each letter by the matrix to get a matrix that represents the encoded text. the matrix representing the encoded text is . what is the secret phrase? determine the location of spaces after you decode the text. yummy is the corn the tomato is red the corn is yummy red is the tomato
Answers: 2
question
Mathematics, 21.06.2019 23:00
Car a and car b were in a race .the driver of car b claimed that his car was twice as fast as car a
Answers: 3
You know the right answer?
A cereal packing machine fill 15 oz boxes at a rate of 3 boxes every 2 minutes. production has sched...
Questions
question
Mathematics, 15.04.2021 04:30
question
History, 15.04.2021 04:30
question
Engineering, 15.04.2021 04:30
question
History, 15.04.2021 04:30
question
Geography, 15.04.2021 04:30
question
Business, 15.04.2021 04:30
Questions on the website: 13722361