subject
Mathematics, 24.11.2020 08:00 jose0765678755

Two machines. Just completed projects at the same time. Machine A completes a project every 1.25 minutes. Machine B completes a project every 4.5 minutes. How long will it be until both machines complete a project

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 23:10
Which graph represents the linear function below? y-4= (4/3)(x-2)
Answers: 2
question
Mathematics, 22.06.2019 00:00
Which of the following are arithmetic sequences? check all that apply. a. 0.3, 0.6, 0.9, 1.2, 1.5, b. 2, 3, 6, 11, 18, c. 150, 147, 144, 142, d. 2, 4, 9, 16, 25,
Answers: 1
question
Mathematics, 22.06.2019 01:30
Given a binomial distribution variable with n=20 and p=0.60 find the following possibilities using the binomial table a) p(x < 13) b) p x > 15) c) p(x = 17) d) p(11 < x < 14) e) p(11 < x < 14)
Answers: 3
question
Mathematics, 22.06.2019 01:40
(co 3) the soup produced by a company has a salt level that is normally distributed with a mean of 5.4 grams and a standard deviation of 0.3 grams. the company takes readings of every 10th bar off the production line. the reading points are 5.8, 5.9, 4.9, 6.5, 5.0, 4.9, 6.2, 5.1, 5.7, 6.1. is the process in control or out of control and why? it is out of control as two of these data points are more than 2 standard deviations from the mean it is in control as the data points more than 2 standard deviations from the mean are far apart it is out of control as one of these data points is more than 3 standard deviations from the mean it is in control as the values jump above and below the mean
Answers: 2
You know the right answer?
Two machines. Just completed projects at the same time. Machine A completes a project every 1.25 min...
Questions
Questions on the website: 13722360