subject
Mathematics, 20.11.2020 06:20 cassandraaa

The construction engineer calculated that she needed 3 support pillars of equal size. She ordered 7 2/3 tons of concrete to make the support pillars. How much concrete did she use for each support pillar?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
Aregular hexagon rotates counterclockwise about its center. it turns through angles greater than 0° and less than or equal to 360°. at how many different angles will the hexagon map onto itself?
Answers: 2
question
Mathematics, 21.06.2019 22:40
Present age of man is 45 years, 5 years back his age was 4 times age of his son what is present age of his son?
Answers: 2
question
Mathematics, 22.06.2019 00:10
A, at (-2, 4), is 6 .of a'? (-8, 4) (-8, -2) (-2, -2) (-2, 4) b, at (-4, -7), isy-.of b'? (-4, 7) (4, -7) (4, 7) (-4, -7)
Answers: 2
question
Mathematics, 22.06.2019 02:00
If the line in the graph is shifted up two units which is the equation of the new line
Answers: 1
You know the right answer?
The construction engineer calculated that she needed 3 support pillars of equal size. She ordered 7...
Questions
question
Mathematics, 02.08.2021 23:40
Questions on the website: 13722363