subject
Mathematics, 18.11.2020 06:10 Jasten

A company manufactures three products A, B and C, which require three raw materials I, II and III. The table given below shows the amount of raw materials required
per kg of each product. The resource availability per day and the profit contribution for
each product is also given.
Product
A B
Availability (Kg)
С C
Raw Material
4
1
800
6
I
5
6
8
1,500
II
2
4
1
1,200
9
10
6
Profit Per Unit (1)
i. Formulate the problem as a linear programming problem.
ii. Solve the problem and determine the optimal product mix

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:10
Two different linear functions are shown below with two points given from each function. use slope-intercept form or point-slope form to find the equation of each. linear function a points: (–5, –2), (–5, 7) linear function b points: (7, –5), (–2, –5) function a has: the equation of line a is: function b has: the equation of line b is:
Answers: 1
question
Mathematics, 21.06.2019 17:30
Consider the graph of the exponential function y=3(2)Ă—
Answers: 1
question
Mathematics, 22.06.2019 00:00
Cole says the distance between points (-5,0) and (0,-5)is 5 units. is he correct? explain why or why not.
Answers: 1
question
Mathematics, 22.06.2019 02:30
Which statement illustrates the distributive property?
Answers: 2
You know the right answer?
A company manufactures three products A, B and C, which require three raw materials I, II and III....
Questions
question
Mathematics, 18.02.2021 20:00
question
Mathematics, 18.02.2021 20:00
question
Mathematics, 18.02.2021 20:00
Questions on the website: 13722359