subject
Mathematics, 13.11.2020 02:50 brummy309506

If the technician charged $327.50, then the technician worked
hours.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
Suppose a ball is dropped fromca height of 6ft. it bounces back up but time it bounces, it reaches only 7/10 of its pervious height. what is the total of each height that the ball reaches after 5 bounces
Answers: 1
question
Mathematics, 21.06.2019 18:30
Atriangle with all sides of equal length is a/an triangle. a. right b. scalene c. equilateral d. isosceles
Answers: 2
question
Mathematics, 21.06.2019 18:30
Astuntman jumping off a 20-m-high building is modeled by the equation h=20-5t^2, where t is the same in seconds. a high-speed camera is ready to film him between 15m and 10m above the ground. for which interval of time should the camera film him?
Answers: 1
question
Mathematics, 21.06.2019 18:30
Can someone check if i did this right since i really want to make sure it’s correct. if you do you so much
Answers: 1
You know the right answer?
If the technician charged $327.50, then the technician worked
hours....
Questions
question
Advanced Placement (AP), 10.07.2019 21:30
Questions on the website: 13722361