subject
Mathematics, 11.11.2020 04:00 aliyahedwards94

A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to build and 4 hours to test. Each adult bike requires 6 hours to build and 4 hours to test. With the number of workers, the company is able to have up to 120 hours of building time and 100 hours of testing time for a week. If c represents child bikes and a represents adult bikes, can the company build 5 child bikes and 15 adult bikes in a week. No, because the bike order does not meet the restrictions of 4c + 6a ≤ 120 and 4c + 4a ≤ 100

No, because the bike order does not meet the restrictions of 4c + 4a ≤ 120 and 6c + 4a ≤ 100

Yes, because the bike order meets the restrictions of 4c + 6a ≤ 120 and 4c + 4a ≤ 100

Yes, because the bike order meets the restrictions of 4c + 4a ≤ 120 and 6c + 4a ≤ 100

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Abe is a triangle. can you use the sss postulate or the sas postulate to prove triangle abc = triangle aed? by sss only neither apply both apply by sas only
Answers: 2
question
Mathematics, 21.06.2019 17:00
16 more than the product of 5 and p
Answers: 3
question
Mathematics, 22.06.2019 03:30
Sections of prefabricated woods are each 5 1/3 feet long, how long are 7 1/2 sections placed end to end?
Answers: 3
question
Mathematics, 22.06.2019 04:00
Renee hiked for 6 3 /4 miles. after resting, renee hiked back along the same route for 5 1 /4 miles. how many more miles does renee need to hike to return to the place where she started? represent your answer as a simplified mixed number, if necessary.
Answers: 1
You know the right answer?
A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to...
Questions
question
Physics, 09.07.2019 01:00
question
Mathematics, 09.07.2019 01:00
question
Mathematics, 09.07.2019 01:00
Questions on the website: 13722367