subject
Mathematics, 31.10.2020 22:00 carinaorcutt

A company has two large computers. The slower computer can spend all the company’s email in 60 minutes. The faster computer can complete the same job in 30 minutes. If both computers are working together, how long will it take them to do the job?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 20:00
Someone answer asap for ! max recorded the heights of 500 male humans. he found that the heights were normally distributed around a mean of 177 centimeters. which statements about max’s data must be true? a. the median of max’s data is 250 b. more than half of the data points max recorded were 177 centimeters. c. a data point chosen at random is as likely to be above the mean as it is to be below the mean. d. every height within three standard deviations of the mean is equally likely to be chosen if a data point is selected at random.
Answers: 1
question
Mathematics, 21.06.2019 22:50
Which statement accurately describes how to perform a 90° clockwise rotation of point a (1,4) around the origin?
Answers: 2
question
Mathematics, 22.06.2019 01:50
According to a study done by de anza students, the height for asian adult males is normally distributed with an average of 66 inches and a standard deviation of 2.5 inches. suppose one asian adult male is randomly chosen. let x = height of the individual. a) give the distribution of x. x ~ b) find the probability that the person is between 64 and 69 inches. write the probability statement. what is the probability?
Answers: 2
question
Mathematics, 22.06.2019 02:30
What is the simplified form of 400x100 ? o 200x10 o 200x50 0 20x10 • 20x50
Answers: 1
You know the right answer?
A company has two large computers. The slower computer can spend all the company’s email in 60 minut...
Questions
question
Mathematics, 04.02.2020 22:53
question
Computers and Technology, 04.02.2020 22:53
question
Geography, 04.02.2020 22:53
Questions on the website: 13722367